-
AlexanderFornecedores confiáveis
-
LouisFoi um prazer trabalhar consigo.
Boiler Economizer Heat Exchanger Tube with Max. 60t/h Capacity 1 Year Warranty EN Standard

Contacte-me para amostras e cupons grátis.
whatsapp:0086 18588475571
WeChat: 0086 18588475571
skype: sales10@aixton.com
Se tiver alguma preocupação, fornecemos ajuda online 24 horas por dia.
xMaterial | Aço inoxidável ou aço carbono | Tipo | Circulação natural |
---|---|---|---|
Uso | Estação de energia | Estrutura | Tubo de fogo |
Pressão | Alta pressão | Produção de vapor | Max. 60 t/h |
Estilo | Vertical | Combustível | Gás-ateado fogo |
Saída | Água quente | Padrão de material | ASTM, EN ou ISO etc. |
Faixa de peso | Min: 10 toneladas, máx .:1000 toneladas | Processo de fusão | EF+LF + VD |
Processo | Material-> Ingot-> Hot/Cold-Rolling-> Tratamento térmico-> Inspeção | Padrão de UT | ASTM A388 ou EN10228 |
Tratamento térmico | Normalizando+ temperamento | ||
Destacar | Max. 60t/h Boiler Economizer,1 Year Warranty Heat Exchanger Tube,EN Standard Economiser |
The boiler steam generation process involves three key stages: feed water preheating, evaporation, and superheating, each occurring on distinct heating surfaces. The boiler economizer serves as the initial stage, preheating feed water before it enters the evaporation system. As the lowest-temperature component in the boiler's steam-water circuit, it handles monophasic water in non-boiling conditions.
- Fuel Efficiency: Positioned at the boiler's rear section, economizers recover waste heat from flue gases, reducing exhaust temperatures and improving overall boiler efficiency while decreasing fuel consumption.
- Steam Drum Protection: Preheated feed water reduces thermal stress on steam drum walls by minimizing temperature differentials, thereby extending equipment service life.
- Cost Reduction: By replacing high-temperature water wall panels with more economical economizer components, boiler manufacturing costs are significantly reduced.
Description | Boiler economizer |
---|---|
Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
Material Standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Smelting Process | EF+LF + VD |
Manufacturing Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment (Normalizing+ tempering)→Inspection→rough machining→UT→2nd Heat treatment→finishing machining→Inspection |
UT Standard | ASTM A388 or EN10228, etc |

- Impact test and Strength calculation report with applied materials information
- 100% NDT (non-destructive inspection) report of steel plate, tube and electrode
- X-ray, γ-ray and liquid penetrant test inspection report (welding seam) to ensure complete boiler quality
- Hydraulic test report to verify standard working pressure and safety compliance